You would have noticed that there are two major problems with this design of channel.
- The maximum height is only 8 cm from channel elevation. This raises the factor of safety concerns and it is suggested to increase this distance so that channel top is at least 15cm from maximum water level.
- Except for constricted section, water depth is much below the top of the channel. This may indicate the unnecessary cost of digging in this area.
Use HEC-RAS to work out different options and propose (in the comments below) suitable suggestions to solve both these point.